Separate the disposal schedule from permission to remove
A seller may control the disposal decision while a landlord, utility, facility owner or other party controls the room, building access or removal path. Treat those as separate approvals. Before accepting an offer, identify who can authorize sale of the equipment and who can approve entry, disconnect work, loading access and transport. A draft schedule is useful for planning, but it is not proof that either party has granted permission. The buyer can assess a proposed purchase with the information available; any agreed handover still depends on documented authority and site rules. Do not enter a restricted room or approach equipment to resolve uncertainty.
Use exact ABB markings, not assumed product details
Record wording exactly as it appears on existing paperwork or on an exterior label that is safely accessible from a site-authorized position. Note the visible ABB marking, any other legible manufacturer or catalog text, equipment description, and identifiers as written; mark unreadable or missing fields as unknown. A name or logo does not establish origin history, product line, technical specification, condition or compatibility, and the buyer makes no manufacturer affiliation claim. If photographs are permitted, take them only of safely accessible equipment exteriors and exterior labels or nameplates from site-authorized safe positions. Never open a cabinet, take internal photographs, or approach equipment to improve a picture.
Keep different ratings distinct in the record
When existing records provide ratings, preserve each value beside its exact label and source. Nominal system voltage is not automatically the assembly voltage; neither is a current rating. Continuous current, device frame, trip rating and interrupting rating are distinct fields and should not be substituted for one another. A single number without its label, units or document context may be ambiguous, so report it as unclear rather than interpreting it. Useful sources may include prior inventories, drawings, schedules or maintenance records already held by authorized personnel. Do not ask sellers to measure, test or open equipment. A purchase assessment does not certify a rating or establish suitability for another installation.
Submit a practical record set without preparing the gear
For an initial review, share the draft disposal schedule, available inventory or drawing references, known ownership and access contacts, and any existing exterior-label information. Include the proposed decision date and the earliest authorized access window if known; describe uncertainties plainly. Do not stage, fabricate, disconnect or test anything for an inquiry. No seller testing is required, and sellers need not prepare the equipment for removal. The buyer purchases equipment across all voltage classes and considers equipment from decommissioned data centers and shut-down power plants as well as other sources, but that scope does not mean a particular ABB-marked asset will be accepted. Each opportunity is assessed individually.
Agree on the handover before setting removal expectations
For an agreed purchase, the buyer covers necessary crane, rigging, disconnects, loading, freight and hauling, subject to the agreed scope and site authorization. The seller does not hire or pay a removal crew. Confirm in writing which party supplies room and route access, any required site approvals, timing constraints, and the point at which custody transfers. All electrical work must be performed by qualified, authorized personnel under site rules. No one should operate, test, touch, open, disconnect, remove or move energized or potentially energized equipment. The buyer does not promise demolition, hazardous-material remediation or removal beyond the agreed equipment and logistics.
Understand the commercial decision and its limits
After reviewing the available records, access authority and proposed handover, the buyer may make a cash offer. For an agreed purchase, payment is made upfront under the agreed terms. Offer and acceptance are assessed individually; neither price nor timing is guaranteed, and an inquiry or draft schedule does not bind either party. The assessment may remain limited where ownership, labels, ratings, condition or route permissions are uncertain. Share only information you are authorized to provide, and seek written approval from the controlling property owner before any site access or removal planning. An offer applies only to the equipment and logistics agreed, not unrelated building work.
